HOLLOWPROJECT

Subsurface research group
Facility 6 · 411 m to 6,200 m
Season 12 · Now intake

Transmission archive · Retention window

Archive

Last 120 entries

Everything the facility files, in the order it was filed. The archive holds the current retention window only; older entries are not deleted so much as no longer referred to. Entries are unverified, as all entries have been since the verification office was itself abandoned in place.

  1. A-003 · Cycle commenced without incident
  2. C-028 · Test cycle scheduled
  3. B-025 · Two instruments, two answers
  4. C-010 · Closed for want of an explanation
  5. A-003 · Entered on the testing schedule
  6. B-013 · Returned to standby
  7. A-016 · Test cycle completed
  8. B-017 · Stood down
  9. Volunteer 11-0106 in A-001 for cycle 104
  10. A-001 · Cycle commenced without incident
  11. A-033 · Test cycle completed
  12. A-049 · Calibration run, routine
  13. A-037 · Routine inspection
  14. B-055 · Approached for survey
  15. A-004 · Stood down
  16. B-003 · Cycle concluded
  17. A-045 · Under test
  18. B-017 · Test window closed
  19. D-002 · Contained. Cause not established
  20. C-028 · Stood down
  21. C-017 · Walked and inspected
  22. A-001 · Scheduled, pending occupancy
  23. D-010 · Passed inspection
  24. B-013 · Test window closed
  25. A-033 · Test cycle commenced
  26. B-025 · Under test
  27. A-045 · Cycle slot allocated
  28. B-023 · Standing by
  29. B-003 · Doors closed, cycle running
  30. C-017 · Cycle ended, results filed
  31. B-017 · Under test
  32. B-052 · Approached for survey
  33. A-030 · Instruments recalibrated
  34. C-028 · Cycle ended, results filed
  35. B-014 · Investigation closed
  36. A-016 · Test window opened
  37. A-033 · Entered on the testing schedule
  38. A-015 · Cleared and idle
  39. B-061 · Returned to the pool
  40. B-037 · Returned to the pool
  41. A-042 · Released from the schedule
  42. A-004 · Concluded, findings pending
  43. B-025 · Added to the day sheet
  44. D-002 · Overpressure recorded
  45. B-003 · Cycle authorized
  46. B-028 · Cleared and idle
  47. A-016 · Entered on the testing schedule
  48. A-015 · Test window closed
  49. B-035 · Sensors reseated
  50. A-024 · Released from the schedule
  51. B-061 · Cycle concluded
  52. C-028 · Doors closed, cycle running
  53. B-037 · Cycle finished early
  54. Volunteer 9-0161 working B-013, cycle 83
  55. B-013 · Cycle begun
  56. B-019 · Standing by
  57. B-017 · Added to the day sheet
  58. A-042 · Test window closed
  59. B-028 · Concluded, findings pending
  60. B-023 · Completed and logged
  61. A-024 · Completed and logged
  62. A-029 · Returned to standby
  63. C-017 · Cycle begun
  64. Archive playback · Sector E: “…and the second survey agreed with neither.”
  65. C-028 · Added to the day sheet
  66. B-061 · Test window opened
  67. B-060 · Back on standby
  68. A-001 · Returned to service after inspection
  69. B-061 · Scheduled, pending occupancy
  70. C-023 · Released from the schedule
  71. B-013 · Scheduled, pending occupancy
  72. Volunteer 9-0149 in A-015 for cycle 113
  73. A-015 · Cycle begun
  74. B-052 · Gas alarm, chamber sealed
  75. B-037 · Cycle commenced without incident
  76. B-007 · Fabric inspection
  77. B-019 · Cycle ended, results filed
  78. B-060 · Cycle ended, results filed
  79. A-029 · Cycle ended, results filed
  80. A-004 · Running
  81. C-017 · Booked for a cycle
  82. B-037 · Entered on the testing schedule
  83. Evacuation chime sounded. Not scheduled, not repeated
  84. C-010 · Acoustic event, source not located
  85. Volunteer 9-0166 took cycle 0 in 158
  86. A-042 · Test cycle commenced
  87. A-015 · Booked for a cycle
  88. A-004 · Entered on the testing schedule
  89. B-070 · Returned to standby
  90. A-030 · Returned to standby
  91. A-025 · Closed for want of an explanation
  92. B-019 · Running
  93. C-023 · Cycle finished early
  94. A-042 · Scheduled, pending occupancy
  95. B-035 · Returned to the pool
  96. C-010 · Booked for a cycle
  97. B-028 · Cycle commenced without incident
  98. Surface office closed for the day. Facility notified
  99. B-028 · Entered on the testing schedule
  100. A-029 · Cycle started on time
  101. B-026 · No findings recorded
  102. B-023 · Cycle started on time
  103. B-014 · Readings withdrawn pending review
  104. B-070 · Completed and logged
  105. A-029 · Scheduled, pending occupancy
  106. Volunteer 10-0142 entered C-023 for cycle 11
  107. C-023 · Cycle commenced without incident
  108. A-024 · Cycle commenced without incident
  109. A-033 · Routine inspection
  110. B-019 · Test cycle scheduled
  111. D-007 · Quiet again
  112. B-014 · Slot confirmed by the schedule office
  113. A-030 · Completed. Nothing to report
  114. B-060 · Doors closed, cycle running
  115. A-024 · Slot confirmed by the schedule office
  116. B-023 · Cycle slot allocated
  117. B-060 · Entered on the testing schedule
  118. B-035 · Cycle finished early
  119. Volunteer 9-0160 working B-052, cycle 44
  120. B-052 · Doors closed, cycle running

On the playback entries

The intercom runs a scheduled loop of archival recordings. The schedule was set in a season we no longer hold records for, and the recordings play to floors that have been empty for longer than that.